15 de ani de Raditech Dry Proiecte

Proiect / Referință

Construcție nouă Tavan de încălzire / răcire
Covoraș cu tub capilar Tencuială Până la 1.000
mp Clădire rezidențială Polonia

Cladire birouri Harghita

Energy-conscious renovation and conversion to social housing with heating/cooling ceilings
  • Construction period: 2018-2019
  • Location: Szklarska Poręba
  • Use: Residential
  • Design: 1,700 m² plaster ceiling with BEKA capillary tube mats for heating and cooling

 

Reconstruction of former barracks into apartments of social housing. Sustainable energy concept with BEKA capillary tube mats for ceiling
heating and cooling, geothermal heat pump and photovoltaic system.

CONSTRUCTION OF TWO NEW BLOCKS OF HIGH QUALITY SOCIAL HOUSING FOR RENT TO FAMILIES. INSTALLATION OF HEATING AND
COOLING CEILINGS FOR COMFORTABLE INDOOR CLIMATE OF THE NEW LIVING SPACES.
  • Construction period: 2024
  • Location: Dzierżoniów
  • Use: Social housing
  • Type: 4,000 m² plaster ceiling with BEKA capillary tube mats